Headlines

Hook-Waltz Road Bridge Under Constuction, 8-28-14 full story...

Ream Road Bridge To Be Closed For Replacement, 8-1-14 full story...

Contract Awarded for Three Allen County Bridge Replacements Through ODOT's Ohio Bridge Partnership Program, 6-26-14 full story...

County Applies for Emergency Funds for Thayer Road Bridge, 6-19-14 full story...

Allen County Engineer Hires GIS Technician, 6-10-14 full story...

Elida Road To Be Sealed, 6-9-14 full story...

Shawnee Road Project Awarded to Eagle Bridge Co., 4-29-14 full story...

Allen County Government Entities Unanimously Endorse State Issue 1 on May Ballot, 4-10-14 full story...

County and Township Crews Fight Snow Storms, 1-27-14 full story...

Lt. Governor Mary Taylor Visits Allen County Garage For Press Conference, 1-23-14 full story...

New Phone System Installed at the Allen County Engineer's Office, 11-21-14 full story...

Ohio Winter Safety Awareness, 11-8-13 full story...

Governor Kasich Announces Bridge Funding Program For County Bridges, 10-31-13 full story...

ACE Employee Fall Cookout, 10-28-13 full story...

Allen County Mechanics Rebuild Stone Chipper, 7-8-13 full story...

Ohio Budget Bill Contains No Funding for County Bridge Replacements, ODOT Directed to Assist Counties, 6-25-13 full story...

Six Additional Bridge Load Limits, 5-30-13 full story...

Allen County Engineer Testifies Before Ohio Senate Ways & Means Committee, 5-22-13 full story...

Four New Bridge Load Limits, 5-15-13 full story...

Allen County Engineer Testifies in Ohio Senate About CAT Tax, 5-10-13 full story...

Speed Limit Changes within the Old Village of Fort Shawnee, 5-1-13 full story...

ADVERTISEMENT

NOTICE TO BIDDERS

THAYER ROAD BRIDGE NO. MON-CR 173-0.10 OPWC PROJECT CONTROL NO. CU57Q THAYER TOWNSHIP; ALLEN COUNTY, OHIO

Sealed bids will be received at the office of the Board of Allen County Commissioners; Court of Appeals Building, 3rd Floor; 204 N. Main Street; Lima, Ohio, until 11:00 o'clock A.M., Friday,  October 3rd, 2014, at which time they will be opened and publicly read aloud. Bids will be for the supply, delivery and erection of seven (7) B12-48 prestressed concrete box beams and related materials on the site of the Thayer Road Bridge No. MON-CR 173-0.10, in Monroe Township; Allen County, Ohio. Beam length shall be 25'-0” c/c bearing.

Material shall be in accordance with the State of Ohio, Department of Transportation, Construction and Material Specifications, dated January 1, 2013 and with the Specifications and Contract Documents prepared by the Allen County Engineer.

Construction plans, Specifications, and Contract Documents may be obtained at no charge from the office of the Allen County Engineer; 1501 N. Sugar Street; Lima, Ohio 45801-3136 or from our website at http://coengr.co.allen.oh.us/Bid_Information.

Each bidder is required to furnish with its proposal, a Bid Guarantee and Contract Bond in accordance with Section 153.54 and 153.571 of the Ohio Revised Code. Bid security shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety.

All bids shall be sealed and addressed to the Board of Allen County Commissioners; Court of Appeals Building, 3rd Floor; 204 N. Main Street; Lima, Ohio 45801 and marked "SEALED BID – THAYER ROAD BRIDGE NO. MON-CR 173-0.10; OPWC PROJECT CONTROL No. CU57Q, MONROE TOWNSHIP, ALLEN COUNTY, OHIO " on the outside of the envelope.

No bidder shall be permitted to withdraw its bid for a period of thirty (30) days after the time of bid opening.  The Board of County Commissioners, Allen County, Ohio reserve the right to reject any or all bids submitted or to wave any irregularities pursuant to Section 9.31 of the Revised Code.

By order of the Board of Allen County Commissioners, Allen County, Ohio Kelli Singhaus, Clerk of Board of County Commissioners
Allen County, Ohio

Please note this contract is for the supply, delivery & erection of beams ONLY.

Any addendums will be posted here. A signed acknowledgement of any addendums will be required to bid on this project; therefore, it is the BIDDERS responsibility to check for any addendums.

Click here to view the Contract Documents.

Click here to view the Project Plans.

 

 

The following projects have already been awarded:

Shawnee Roundabout

  • Plans

Part A

Part A Addendum (Revisions)

Part B

Part B Addendum (Revisions)

Standard Drawings (ODOT)

Standard Drawings (Allen County)

  • Contract Documents

Advertisement

Contract (Password Protected)

Schedule of Unit Prices (Addendum) (Password Protected)

Click here to request a password.

Addendum 1

Addendum 2

  • Reports/Permits

Army Corps Permit

Asbestos Report (Bridge)

Asbestos Report (Fisca)

Buckeye Pipeline Right-of-Way Use Restrictions

Buckeye Pipeline Relocation Plans

Davis Bacon Wage Rates, 3-14-14

Geotechnical Report

Phase II ESA Report

Pre-Bid Meeting Announcement

Pre-Bid Meeting Questions & Answers

Shawnee Road Plans (1958)

 

Hook-Waltz Road Bridge

  • Plans

Complete Set

  • Contract Documents

Advertisement

Contract (Password Protected)

Schedule of Unit Prices (Password Protected)

Click here to request a password.

  • Reports/Permits

Army Corps Permit

Asbestos Report (Bridge)

Davis Bacon Wage Rates, 3-14-14

Geotechnical Report

Utility Note