Eastown Road Photos

Google
WWW coengr.co.allen.oh.us

Headlines

Piper Files Petitions for Re-Election, 11-28-11 full story...

Bliss, Bowsher and Osman Bridges Reopened, 11-23-11 full story...

Winter Safety Week, 11-10-11 full story...

Bliss, Bowsher & Osman Road Bridge Projects Awarded, 4-28-11 full story...

2010/2011 Annual Report is Here, 5-4-10 full story...

Allen County Installs "When Flooded Turn Around Don't Drown" Signs, 3-30-11 full story...

February 2011 Flooding Photos, 3-1-11 full story...

Allen County Revises Permit Applications, 2-7-11 full story...

Timothy J. Piper, P.E., P.S., Elected Second Vice-President Of CEAO For 2011, 12-15-10 full story...

Lora K. Redick Elected Vice-President of CCC/EAPA For 2011, 12-15-10 full story...

Phase 2
 
July 2008
Click to Enlarge.
Click to Enlarge.
Removing old bridge beams.
Removing old bridge beams.
Click to Enlarge.
Click to Enlarge.
Removing old bridge beams.
Removing old bridge beams.
 
September 2008
Click to Enlarge.
Click to Enlarge.
Setting new bridge beams.
Setting new bridge beams.
Click to Enlarge.
Click to Enlarge.
Setting new bridge beams.
Setting new bridge beams.
Click to Enlarge.
Click to Enlarge.
Setting new bridge beams.
Setting new bridge beams.
 
October 2008
Click to Enlarge.
Click to Enlarge.
Pouring new bridge deck.
Pouring new bridge deck.
Click to Enlarge.
Click to Enlarge.
Pouring new bridge deck.
Pouring new bridge deck.
Click to Enlarge.
Click to Enlarge.
Pouring new bridge deck.
Pouring new bridge deck.
 
July 2009
Click to Enlarge.
Click to Enlarge.
Stone base installed south of railroad.
Preparing for curbing south of railroad.
Click to Enlarge.
Click to Enlarge.
Pouring curbing south of railroad.
Curbing poured south of railroad.
Click to Enlarge.
Click to Enlarge.
Curbing poured south of railroad.
Curbing poured south of railroad.
Click to Enlarge.
Click to Enlarge.
Installing drainage south of SR 309.
Installing drainage south of SR 309.
 
September 2009
Click to Enlarge.
Click to Enlarge.
Striping
Installing thermoplastic pavement markings.
Click to Enlarge.
Click to Enlarge.
Pavement markings @ SR 309.
Open to traffic.
Click to Enlarge.
Click to Enlarge.
Open to traffic.
Open to traffic.
 
Phase 4
 
April 2009
Click to Enlarge.
Click to Enlarge.
House demolition.
House demolition.
Click to Enlarge.
Mulching trees.
 
May 2009
Click to Enlarge.
Click to Enlarge.
Culvert under the railroad.
Installing culvert.
Click to Enlarge.
Click to Enlarge.
Extending railroad culvert.
Grading at railroad.
Click to Enlarge.
Grading north of railroad.
 
June 2009
Click to Enlarge.
Click to Enlarge.
Drainage structure.
Grading @ Springview.
Click to Enlarge.
Click to Enlarge.
Cement subgrade stablization.
Cement subgrade stablization.
Click to Enlarge.
Click to Enlarge.
Cement subgrade stablization.
Cement subgrade stablization.
Click to Enlarge.
Click to Enlarge.
Final grading of subgrade.
Installing stone base.
 
July 2009
Click to Enlarge.
Click to Enlarge.
Installing stone base @ Makley.
Installing manhole.
Click to Enlarge.
Click to Enlarge.
Pouring curbing.
Pouring curbing.
Click to Enlarge.
Click to Enlarge.
Pouring curbing.
Curbing installed.
Click to Enlarge.
Click to Enlarge.
Grading behind curbing.
Grading behind curbing.
 
August 2009
Click to Enlarge.
Click to Enlarge.
Installing topsoil in the median.
Installing asphalt base course.
Click to Enlarge.
Click to Enlarge.
Installing asphalt base course.
Tack coat down for intermediate course.
Click to Enlarge.
Click to Enlarge.
Paving intermediate course.
Paving intermediate course.
Click to Enlarge.
Click to Enlarge.
@ Makley looking north.
@ Elm looking south.
Click to Enlarge.
Click to Enlarge.
@ Makley looking west.
@ Makley looking east.
 
September 2009
Click to Enlarge.
Click to Enlarge.
Installing catch basin.
Pouring median curbing.
Click to Enlarge.
Click to Enlarge.
Curbing @ railroad.
Curbing installed.
Click to Enlarge.
Click to Enlarge.
Curb ramp @ SR 117.
Excavating to widen SR 117.
Click to Enlarge.
Click to Enlarge.
Installing stone base @ SR 117.
Grinding SR 117.
Click to Enlarge.
Click to Enlarge.
Installing asphalt base on SR 117.
Installing asphalt base.
 
October 2009
Click to Enlarge.
Click to Enlarge.
Intalling trees & shrubs.
Preparing to plant grass.
Click to Enlarge.
Click to Enlarge.
Blowing staw.
Hydroseeding the median.
Click to Enlarge.
Click to Enlarge.
Installing guardrail.
Completed guardrail.
Click to Enlarge.
Click to Enlarge.
Installing signage.
Landscaping completed.
Click to Enlarge.
Click to Enlarge.
Adjusting manhole.
Adjusting manhole.
Click to Enlarge.
Click to Enlarge.
Adjusting manhole.
Manhole adjustment completed.
Click to Enlarge.
Click to Enlarge.
Striping.
Installing thermoplastic.
Click to Enlarge.
Click to Enlarge.
Installing traffic signals @ SR 117.
Adjusting traffic detecting camara.
Click to Enlarge.
Click to Enlarge.
Traffic signals installed @ SR 117.
Traffic signal controller cabinet.
Click to Enlarge.
Click to Enlarge.
Traffic signal controller cabinet.
Traffic signal controller cabinet.
Click to Enlarge.
Click to Enlarge.
U-Turn allowed sign.
Deer crossing sign.
Click to Enlarge.
Click to Enlarge.
@ Elm looking north.
@ Elm looking south.
Click to Enlarge.
Click to Enlarge.
@ Elm looking west.
@ Elm looking east.
Click to Enlarge.
Click to Enlarge.
@ Makley looking north.
@ Makley looking south.
Click to Enlarge.
Click to Enlarge.
@ Makley looking west.
@ Makley looking east.
Click to Enlarge.
Click to Enlarge.
@ Springview looking north.
@ Springview looking south.
Click to Enlarge.
Click to Enlarge.
@ Springview looking west.
@ Springview looking east.
Click to Enlarge.
Click to Enlarge.
@ SR 117 looking north.
@ SR 117 looking west.
Click to Enlarge.
@ SR 117 looking east.
Click to Enlarge.
Click to Enlarge.
Removing barrels @ Elm.
Removing barricades @ Elm.
Click to Enlarge.
Click to Enlarge.
First vehicle to travel down Eastown.
Eastown @ Elm.
Click to Enlarge.
Click to Enlarge.
Makley looking south.
@ SR 117.