Headlines
Wayne C. Gerdeman Memorial Dedication, 8-10-10 full story...
What Are Wind Farms?, 8-3-10 full story...
2009/2010 Annual Report is Here, 5-4-10 full story...
Commissioners Approve Final Change Orders for Eastown Road Phases 2 & 4, 4-21-10 full story...
2010 County & Township Road Program Approved, 4-21-10 full story...
Congratulations to Matt & Laura Mumma, 1-7-10 full story...
Allen County Crews Repair Ridge Road Flagstone Arch, 1-4-10 full story...
Brion Rhodes Named CEAO Employee of the Year, 12-22-09 full story...
Cotner Road Bridge Opened, 11-23-09 full story...
Fruend Road Bridge Opened, 11-18-09 full story...
Dan Hanjora Promoted to Road Maintenance Superintendent, 11-4-09 full story...
Eastown Road Phase 4 Opens, 10-29-09 full story...
Brion Rhodes Promoted to Chief Deputy Engineer, 10-28-09 full story...
Steve Dunlap, Road Maintenance Superintendent, to Retire, 10-28-09 full story...
Bill Cochenspager Hired as Personnel Director, 10-7-09 full story...
Allen County Chief Deputy Engineer Leaving, 9-30-09 full story...
Congratulations to Josh & Michelle Foster, 9-30-09 full story...
Eastown Phase 2 Opened September 3, 9-2-09 full story...
The Lima News 1/1/04
Permit applications revised
The Allen County Engineer's Office has revised it's permit applications. The office requires permits for all work done within a road's right-of-way.
Permits are required for installation of a driveway; utility work consisting of road cuts, bore pits and trenching within the right-of-way; tapping into roadside drainage tiles; and hauling overweight items.
Permit applications include a nominal fee and a performance bond |
|
to ensure proper procedures are followed. Fees will be assessed for the working without a permit.
Permit revisions were made to ensure work within roadside rights-of-way meet Allen County standards. The new revisions went into effect on January 1, 2004.
Applications can be obtained at the Allen County Engineer's Office, 1501 N. Sugar St. The office phone number is 228-3196. |
What You Will Need For Permit Applications
Application will require approximately 5 minutes to fill out and will only be valid for 90 days. Permit applications must be received 2 days prior to construction.
Permits Obtained from the Allen County Engineer's Office (County Roads Only)
| Type of Permit |
Fee |
Maintenance Fee |
Performance Bond |
Total |
Driveway |
$100 |
$0 |
$900 |
$1000 |
Moving |
See "Fee Schedule" on Back of Permit Application |
Construction Within Road Right-of-Way |
$100 |
$100 |
$800 |
$1000 |
Click on a link below to download an application. Bring or mail the completed application, along with a check (payable to Allen County Engineer) for the corresponding total, to the Allen County Engineer's Office.