Real American Strength

 

Allen County Engineer

Permits

Google
WWW coengr.co.allen.oh.us

Headlines

Piper Files Petitions for Re-Election, 11-28-11 full story...

Bliss, Bowsher and Osman Bridges Reopened, 11-23-11 full story...

Winter Safety Week, 11-10-11 full story...

Bliss, Bowsher & Osman Road Bridge Projects Awarded, 4-28-11 full story...

2010/2011 Annual Report is Here, 5-4-10 full story...

Allen County Installs "When Flooded Turn Around Don't Drown" Signs, 3-30-11 full story...

February 2011 Flooding Photos, 3-1-11 full story...

Allen County Revises Permit Applications, 2-7-11 full story...

Timothy J. Piper, P.E., P.S., Elected Second Vice-President Of CEAO For 2011, 12-15-10 full story...

Lora K. Redick Elected Vice-President of CCC/EAPA For 2011, 12-15-10 full story...

The Lima News                                                                              1/1/04
Permit applications revised

     The Allen County Engineer's Office has revised it's permit applications. The office requires permits for all work done within a road's right-of-way.
     Permits are required for installation of a driveway; utility work consisting of road cuts, bore pits and trenching within the right-of-way; tapping into roadside drainage tiles; and hauling overweight items.
      Permit applications include a nominal fee and a performance bond
  to ensure proper procedures are followed. Fees will be assessed for working without a permit.
      Permit revisions were made to ensure work within roadside rights-of-way meet Allen County standards. The new revisions went into effect on January 1, 2004.
     Applications can be obtained at the Allen County Engineer's Office, 1501 N. Sugar St. The office phone number is 419-228-3196.

An application will require approximately 5 minutes to fill out and will only be valid for 90 days. Permit applications must be received a minimum of 2 days prior to construction.

Permits Obtained from the Allen County Engineer's Office (County Roads Only)
Type of Permit Fee Performance Bond Total
Access
$0
$0
$0
Address
$0
$0
$0
Construction Within Road Right-of-Way (Private)
$200
$800
$1000
Construction Within Road Right-of-Way (Utility)
$200
10% of Total Project Cost ($5000 Minimum)
Varies
Driveway
$100
$900
$1000
Moving
See "Fee Schedule" on Back of Permit Application